Snow Hill Public Realm Update

19 March 2020

Contractors are carrying out initial ground investigative work to prepare for the future Snow Hill Public Realm scheme starting in April 2020. The extent of the site investigations has expanded to better understand the existing ground condition.  The additional work will be carried out within the same 3 week time frame as the initial ground investigations works (9th March 2020 – 30th March 2020).

Pedestrian access is being maintained to properties and businesses at all times, with temporary pedestrian walkways being implemented where required.

Due to the location of some of the trenches they will need to temporarily suspend the two loading bays outside Pret a Manger/Halifax and Tesco, however the contractor will have pedestrian marshals on-site to assist with enquiries and access arrangements for deliveries during the construction works. Similarly they will need to temporarily suspend a section of the taxi rank outside of Snow Hill Station, however taxis will still be able to use the section of the taxi rank that will remain open. Should you require any further information, please contact Jordan Quinn on 07516031628 or email at: transport.projects@birmingham.gov.uk.